The CamelHive Standard · v3.25.0
CH-COST-009v3.25.0Monthly infrastructure cost is known, tracked, and acceptable for the current stage
Pinned as it read in catalog v3.25.0 — the current version of this rule may read differently, see CH-COST-009.
- Area
- COST
- Severity
- medium
- Detection
- judgment
- Corpus coverage
- not measured by the corpus